Turner Turnpike I-44/ SH-66 Interchange Tulsa, OK
Tulsa, OK

Project Overview
The Turner Turnpike I-44/ SH-66 Interchange Modification was a $35 million project located at the eastern end of the Turner Turnpike in southwest Tulsa at a location formerly called the “Tulsa Gate”. The work involved eliminating the left lane exit from WB I-44 to SH-66, widened I-44 to 6 lanes, and created a two-lane, right side exit for WB SH-66 including a new bridge taking those lanes over the turnpike. Other work included a 1/4 mile-long extension of Skelly Drive to S 63rd W Ave and a new street connection to SH-66 to improve safety at the interchange.
Work Done
- Heavy Highway/ Urban Expressways
- Bridge Construction
- Cast-In-Place & Pre-Cast Retaining Walls
- Mass Earthwork
- Concrete & Asphalt Paving
- Crushed Aggregates
- Drainage Pipe & Structures
- Slipform Barrier Wall
- Slope Wall & Ditch Liner
Products and Quantities
- 348,000 CY Earthwork
- 86,000 TN Aggregate Base
- 135,000 SY Stabilized Subgrade
- 96,000 SY Cement Treated Base
- 38,000TN Asphalt Paving
- 92,000 SY Concrete Paving
- 8,000 LF RCP Storm Sewer
- 59,000 SY Concrete Pavement Removal
- 73,000 SY Asphalt Pavement Removal
- 1,276 LF Concrete Bridge Beams
- 1,000 CY Bridge Concrete
- 390 LF Drilled Shafts
- 2,389 SY MSE Retaining Wall
- 1,000 CY Cast-In-Place Retaining Wall
Work Done
- Heavy Highway/ Urban Expressways
- Bridge Construction
- Cast-In-Place & Pre-Cast Retaining Walls
- Mass Earthwork
- Concrete & Asphalt Paving
- Crushed Aggregates
- Drainage Pipe & Structures
- Slipform Barrier Wall
- Slope Wall & Ditch Liner
Products and Quantities
- 348,000 CY Earthwork
- 86,000 TN Aggregate Base
- 135,000 SY Stabilized Subgrade
- 96,000 SY Cement Treated Base
- 38,000TN Asphalt Paving
- 92,000 SY Concrete Paving
- 8,000 LF RCP Storm Sewer
- 59,000 SY Concrete Pavement Removal
- 73,000 SY Asphalt Pavement Removal
- 1,276 LF Concrete Bridge Beams
- 1,000 CY Bridge Concrete
- 390 LF Drilled Shafts
- 2,389 SY MSE Retaining Wall
- 1,000 CY Cast-In-Place Retaining Wall
Project Overview
The Turner Turnpike I-44/ SH-66 Interchange Modification was a $35 million project located at the eastern end of the Turner Turnpike in southwest Tulsa at a location formerly called the “Tulsa Gate”. The work involved eliminating the left lane exit from WB I-44 to SH-66, widened I-44 to 6 lanes, and created a two-lane, right side exit for WB SH-66 including a new bridge taking those lanes over the turnpike. Other work included a 1/4 mile-long extension of Skelly Drive to S 63rd W Ave and a new street connection to SH-66 to improve safety at the interchange.